18 May 2017
Category:
bathroom
Comments: 0

Bathroom Refurbishment SW11

A complete Low-Budget bathroom refurbishment including:
removing floor tiles;
– removing wall tiles;
– removing bath, sink, toilet;
– removing ceiling;
– install new ceiling;
– install 4 spot lights;
– remove old bath
– remove old switch and install new Light Switch on hallway;
– change door opening direction (remaining holes repair);
– install new pipes network as per our project details;
– build-up stud wall;
– tanking bath area;
– tiling bath area walls and sink/cabinet area;
– tiling floor;
– install new bath with bath screen;
– install new toilet;
– install new vanity unit;
– grouting;
– painting walls and ceiling.Rip Off bathroom including ceiling

Remove old bath

Stud wall

Plumbing network

Bathroom Plasterboard and new bath

Plywood floor

7

Mixer in the wall

Storage area for shampoons

Niche next to the shower head

11

12

Small Tiles installation

ceiling

niche tiling bath

Floor tiling

wall tiling small tiles

complete bathroom installation

Bath and bath screen

20

mirror installation bathroom

vanity units basin and bath installation

floor grouting bathroom

complete bathroom installation

wall shower head

low budget bathroom

Leave a Reply

Your email address will not be published. Required fields are marked *